Notice:
  • Admit card of the Written Test of 03 categories of posts i.e. Assistant Manager (Mechanical), Assistant Manager (Electrical) & Assistant Manager (Procurement/Contracts/C&M) of BIFPCL. To Download Admit Card Click to download !
  • Invitation for Bid (IFB) for Procurement and Delivery of 2.0MMT of Imported Coal at Plant Jetty (CDP) for the 2x660 MW Maitree Super Thermal Power Project. Click here !
  • Expression of Interest (EOI) for Sale and Disposal of Scrap/surplus Items (5th Phase), as is where is Basis from 2X660MW Maitree Super Thermal Power Project at Rampal, Bagerhat, Bangladesh Click here !
  • Request for Proposal (RFP) for Sale and Disposal of Scrap/surplus Items (5th Phase), as is where is Basis from 2X660MW Maitree Super Thermal Power Project at Rampal, Bagerhat, Bangladesh Click here !
  • Invitation for Bid (IFB) for “SUPPLY OF LT & HT CABLES at 2×660 MW MSTPP, Rampal, Bagerhat. Click here !
  • PROCUREMENT OF RO CHEMICALS, POLYELECTROLYTE (CATIONIC) FOR PRE-TREATMENT PLANT, AND COOLING WATER TREATMENT PLANT CHEMICAL AT 2X660MW MSTPP, RAMPAL, BAGERHAT Click here !
  • Procurement of Ceramic Wool & Rockwool Insulation, Aluminum Coil Sheet, Ceramic Rope & Tape Required by MMD at 2×660 MW MSTPP, Rampal, Bagerhat Click here !
  • PRE-BID MEETING FOR PROCUREMENT OF SPIRAL WOUND GASKET FOR HIGH PRESSURE/TEMPERATURE APPLICATION IN BOILER, TURBINE AREA AT 2X660MW MSTPP,RAMPAL,BAGERHAT. Click here !

WELCOME TO BIFPCL

About

Bangladesh India Friendship Power Company Ltd (50:50 JV between NTPC &Bangladesh Power Development Board (BPDB)

Rampal 1320 MegaWatts Coal Power Plant

Project: Maitree Super Thermal Power Project (2X660 MW)
Location: Upazila:Rampal; Division:Khulna; District:Bagerhat, Bangladesh The site is located about 23 km southward of Khulna City and 14 km north of Mongla Port.
Approved Capacity: 1320 MW (2 units of 660 MW each)
Beneficiaries: 100% Power to BPDB of Bangladesh
Fuel: Usage of imported coal envisaged for the project.
EIA Study: EIA report has been approved by DOE (Dept of Environment), Bangladesh on 05.08.2013.
Power Evacuation System: Generation Step up voltage is 400 KV, 400 KV Double Circuit (D/C) Line to connect Dhaka ring main. 220 KV Double Circuit (D/C) Line to connect to Khulna substation.
Land Requirement: 915.5 acres of land available for the project. Land is owned by BPDB for which land lease agreement under signing with BPDB.
Water Source: Saline water from Pussur River for meeting cooling water requirement. Sweet water required for meeting the potable water, plant service water, cycle makeup (DM water), etc, shall be produced using Desalination process from saline water through Reverse Osmosis process.

Facts

CAPEX(bUSD)

Milestones

Manpower

Units of 66O MW